Contract Awarded for Major Traffic Study on Northeast Avalon

  • Transportation and Infrastructure

September 18, 2026

The Provincial Government has awarded a contract valued at $645,400 to WSP Canada Inc. to undertake a comprehensive traffic study of Pitts Memorial Drive (Route 2) and the Trans-Canada Highway interchange, supporting ongoing efforts to improve road safety, reduce congestion, and plan for future transportation needs in the Northeast Avalon region.

The study will be completed in two phases and will assess traffic movement along one of the busiest transportation corridors in Newfoundland and Labrador.

The first phase will examine current traffic conditions from Peacekeeper’s Way and the Manuels Access Road through Conception Bay South, Pitt’s Memorial Drive to the CNR Viaduct in downtown St. John’s, as well as the Trans-Canada Highway from Paddy’s Pond (Exit 40) to Allandale Road (Exit 46), including connecting roads, ramps, intersections and nearby overpasses.

The work will identify areas where traffic congestion occurs, assess delays experienced by motorists, and evaluate potential safety improvements. The study will also consider a range of transportation enhancement opportunities, including the addition of a new driving lane on the Trans-Canada Highway and the construction of new highway interchanges at key locations. A draft report for Phase One is anticipated by spring 2027.

Phase Two will focus on the future of the existing Cloverleaf Overpass interchange where Route 2 meets the Trans-Canada Highway. WSP Canada Inc. will develop and evaluate several design concepts, including upgrades to the current interchange configuration as well as entirely new interchange options. A draft report for this phase is expected by late summer 2027.

Recognizing the important relationship between municipal and provincial transportation networks, input from surrounding municipalities, including St. John’s, Mount Pearl, Paradise and Conception Bay South, will be considered throughout the process to help identify and address traffic challenges where these systems connect.

Once completed, the study will help identify preferred options that enhance safety, improve traffic flow and provide long-term value for the motoring public. The work forms part of the Provincial Government’s continued commitment to supporting economic growth and ensuring residents have access to safe, efficient transportation infrastructure.

Information on public calls for bids issued and awarded by the Provincial Government and other public bodies is available by visiting www.merx.com/govnl

Quote
“The major provincial highways from Conception Bay South to the downtown St. John’s area and the Trans-Canada Highway corridor are critical transportation links that serve thousands of motorists every day. This study will provide important information to help us plan for future growth, address traffic challenges and identify opportunities to improve safety and efficiency for residents and visitors travelling through the region.”
Honourable Barry Petten
Minister of Transportation and Infrastructure
Minister of Municipal and Community Affairs

-30-

2026 09 18 4:00 pm