Warning: It seems JavaScript is either disabled or not supported by your browser. Please enable JavaScript to improve your experience.

Reference Information for Quarry Applicants and Operators

  1. Service Provider Listing

    • The Mineral Lands Division maintains a listing of service providers that offer fees for service assistance with various quarry-related needs such as applications, mapping, legal surveys, aggregate resource assessments, development, rehabilitation and closure plans, environmental assessment registration documents, stake-holder engagement, etc.
    • Service Provider Listing.pdf
  2. Quarry Rehabilitation & Closure

    • Quarry permits and leases must be rehabilitated in accordance with the terms and conditions of the permit/lease in accordance with the Quarry Materials Act.
    • Rehabilitation has multiple goals including:
      • Restore the quarry site to a physically and chemically stable, and safe condition to protect public health and safety.
      • To decommission the quarry site to a land use similar to its original use or another to a use that is compatible with neighboring land uses.
    • Rehabilitation can take multiple forms, for example:
      • Progressive rehabilitation requires you to rehabilitate the areas of your site that are no longer needed while you are extracting quarry resources in other areas of your site, or while you retain the permit, but you aren’t actively operating the site.
      • Final rehabilitation must be completed for any site that will no longer be used (i.e., its quarry resources have been exhausted or are limited) or is no longer required by the permittee and cancelled.
    • The standard terms and conditions of all quarry permits and leases outline comprehensive rehabilitation requirements (Schedule B, Section E), all of which are required for final rehabilitation.
    • Common forms of rehabilitation include:
      • Grading and Fill of Excavated Areas
        • Rock faces sloped to a 2:1 gradient
        • Unconsolidated aggregate (sand / gravel) faces sloped to 3:1 gradient
        • Settling ponds and water sumps backfilled
        • All material used for sloping or fill must be sourced from the quarry operation itself or from existing stockpiles of aggregate or overburden. Topsoil and grubbing material must be stockpiled separately to be used for revegetation.
        • Importing of topsoil, overburden or other fill material is allowed but must be pre-approved by the Department.
      • Revegetation and Regeneration of Quarry Site
        • Topsoil and grubbing material excavated from the quarry operation must be stockpiled separately from overburden and aggregate product and remain on site for final rehabilitation and closure.
        • Topsoil and grubbing material are to be spread over entire site and select slopes as directed.
        • Hydroseeding or planting may be required when there is not enough topsoil or grubbing to cover the site or to mitigate impacts on visibility or viewscape.
      • Surface Water and Drainage
        • There shall be no areas of accumulated or ponded water in the quarry (e.g., settling ponds, ponded water in low-lying areas).
        • Prior to abandoning the site, drainage measures must be implemented to prevent future accumulation of water once the site is closed.
        • You must notify the Department of any draining ditches, culverts, check damns remaining after closure of the site.
        • Install sediment control devices to prevent sediment infiltration of natural water bodies.
      • Equipment and Buildings
        • All equipment such as concrete batch plants, asphalt plants, and weigh scales must be temporary in construction. No permanent equipment can be installed unless approved by the Department.
        • Outbuildings used for office space or storage must be temporary in construction. No permanent outbuildings are permitted to be constructed unless approved by the Department.
        • All equipment, buildings and structures must be removed from site prior to submitting a request to close the quarry.
      • Clean and Orderly Site
        • Remove all scrap equipment and garbage from the site.
        • Remove all imported material including waste asphalt or concrete from the site.
        • Remove all equipment from the site including heavy equipment, screeners, culverts, scrap steel, etc.
      • Entrances and Exits must be decommissioned
    • If you have any questions or concerns regarding the rehabilitation requirements for a specific quarry site, please contact the Department by email at QuarryInspections@gov.nl.ca
  3. Working in a Transportation and Infrastructure Quarry

    • The Department of Transportation and Infrastructure maintains quarries across the province for use by government or companies awarded government contracts.
    • Currently active quarry permits:
    File NumberGeneral LocationSize (Ha)Expiry Date
    71171751.3km east Flat Bay Brook Bridge off T.C.H.57/29/2026
    7119234Approx 500m south of Green Island Cove25/31/2026
    71184832km north of Eddies Cove West off R43015/30/2026
    7116053Glenburnie, 100m from Middle Brook15/31/2026
    7117914Approx 7km South of Cooks Harbour15/31/2026
    7113564North Side of Route 333, 2 km east of Stag Harbour56/27/2026
    71153142 km south of Deep Bay Intersection with Route 33326/27/2026
    7115315Fogo Island, 0.4 km from junction of Route 33356/27/2026
    7119291South of Green Island Cove26/19/2026
    71150791/10TH km from Flat Bay Access Road & T.C.H. Inter8.758/31/2026
    71160627km South of Inter Route 362&362-10, Pools Cove57/10/2026
    71191792.1km West R360 on William's Rd (Resource Road)47/10/2026
    711900583km from TCH, East of R360, Berry Hill Pond47/10/2026
    71160639km South of Intersection Route 362-362-10, Pools Cove57/10/2026
    71151630.2 km from Furby's Cove Intersection57/10/2026
    7115537South of Wreck Cove Intersection with Route 3630.57/10/2026
    7118317Route 220 (Jims Pond); 150 m generally East at 0.61 km Northeast of pond1.014/15/2026
    71156043.8 km north of Pieduck Cove Inter on Route 22024/15/2026
    7114363Easterly from Route 210, 500m east of Famine Brook44/15/2026
    7114364White Point Road, Frenchmans Cove24/15/2026
    7119007Route 432; 600 m West of Route 433 junction29/22/2026
    71181913.1 km South of Daniel's Harbour Motel28/19/2026
    71153791 km east of Hampden Turnoff on T.C.H.57/29/2026
    711109464.7 km south of intersection Route 435 with Route 430, located on Route 4300.9411/25/2026
    7118318Routte 220; South side at 4.0 km W of Lamaline0.8741/29/2027
    7116396Approx 1.2km East Point May Inter on Route 2200.421/29/2027
    711923510.5km North of Roddickton1.58/31/2026
    7115967Squid Cove Forest Access Road58/31/2026
    71188787118878412/17/2026
    7114321TCH (Peak Pond); South side at 0.25 km West of Spread Eagle River511/13/2026
    7116682Approx 1km West of Greenspond Causeway Bridge2.7411/23/2026
    7118869Route 10 (South side) at Tors Cove Depot6.82/4/2027
    7115124400m from Route 231 at Robinsons Bight, Long Pond4.121/18/2027
    7115484Route 10, 0.2 km North of Three Gully River56/6/2026
    7115505Between Point LaHaye and St.Mary's1.716/6/2026
    71159161.7km north of Inter with Route 93 & Route 93-1056/6/2026
    7115485Approx 6km northeast of St.Shotts on Route 10-52 5 6/6/2026
    • Companies that have been awarded a contract for provincial infrastructure-related projects (e.g., highway construction, winter sand, etc.) can apply to operate in a TI quarry site under a Subordinate Quarry Permit.
    • All requests to operate in a TI quarry must be submitted to TIQuarries@gov.nl.ca
  4. Heavy Civil Association