Proponent: Town of Portugal Cove South
Summary of Environmental Assessment Process
Project Description:
The Proponent is proposing to connect and upgrade two historical multiuse trails used for walking, biking, and ATV use, to increase regional tourism and recreation opportunities. The connected trail would be approximately 25 kilometres long, beginning in Portugal Cove South and ending at Cape Race, following historical segments of the former Southern Shore highway and Marconi Telegraph path. The undertaking would require the construction of approximately 5.9 kilometres of new trail and a small bridge crossing Clam Cove River. Construction of the trail would include grubbing, tree clearing, and the installation of signage and a small culvert. Construction of the bridge would include the installation of gabion cages on the riverbanks, cast iron tresses, and lumber decking and railing.
- January 30, 2024 – The undertaking was registered.
- March 5, 2024 – Deadline for public comments.
- March 15, 2024 – The Minister’s decision is due.
- March 14, 2024 – The Minister determined that the Project is released.
- Documents:
- Registration Document (2 MB)
- Decision Letter (950 KB)
- Attachment A (97 KB)
- Public Notices:
- Project Registered (139KB)
- Project Released (147 KB)
Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free