Proponent: Bell Canada
Summary of Environmental Assessment Process
Project Description:
The proponent is proposing to install 167.8 kilometres of fibre optic cables within the existing power utility, right‑of‑way in the Codroy Valley and South Branch regions of southwestern Newfoundland. Project activities would include vegetation clearing, tree trimming, and pole replacements, followed by the installation of the new fibre optic cable.
- March 12, 2026 – The undertaking was registered.
- April 17, 2026 – Deadline for public comments.
- April 26, 2026 – The Minister’s decision is due.
- Documents:
- Registration Document (4 MB)
- Appendix A (42 MB)
- Appendix B (21 MB)
- Appendix C (25 MB)
- Appendix D (11 MB)
- Appendix E (7 MB)
- Registration Document (4 MB)
- Public Notices:
- Project Registered (118 KB)
Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free