Full PDF of Division 3 (March 2024)
Section # | Specification Name | Current Version | Previous Version |
300 | Index | 300 (March 2024) | 300 (March 2023) |
301 | Scarifying and Reshaping | 301 (March 2022) | 301 (March 2011) |
305 | Supply and Application of Calcium Chloride | 305 (March 2022) | 305 (March 2011) |
310 | Using of Pits, Quarries and Stockpiles for Production of Materials Supplied by the Contractor | 310 (March 2022) | 310 (March 2011) |
315 | Selected Granular Base Course | 315 (March 2022) | 315 (March 2012) |
316 | Compaction for Granular and Other Material | 316 (March 2024) | 316 (March 2023) |
317 | Winter Sand | 317 (March 2022) | 317 (March 2011) |
320 | Tack Coat | 320 (March 2023 | 320 (March 2022) |
330 | Hot Mix Asphaltic Concrete – General | 330 (March 2024) | 330 (March 2023) |
331 | Performance Graded Asphalt Binder | 331 (June 2023) | N/A |
332 | Hot Mix Asphaltic Concrete – Method Specification | 332 (March 2024) | 332 (March 2023) |
333 | Hot Mix Asphaltic Concrete – End Product Specification | 333 (March 2024) | 333 (March 2023) |
334 | Pavement Smoothness | 334 (March 2022) | N/A |
337 | Warm Mix Asphalt | 337 (March 2024) | 337 (March 2023) |
340 | Chip Seal | 340 (March 2022) | 340 (March 2011) |
350 | Crack Sealing | 350 (March 2022) | 350 (March 2011) |
360 | Cold Planing | 360 (March 2023) | 360 (March 2022) |
370 | Pulverize Existing Asphalt | 370 (March 2023) | 370 (March 2022 |