Division 4 – Drainage Related Systems

Full PDF of Division 4 (March 2024)

Section # Specification Name Current Version Previous Version
400 Index 400 (March 2024) 400 (March 2023)
401 Ditching for Streams 401 (March 2022) 401 (March 2011)
402 Permanent Relocation of Streams 402 (March 2022) 402 (March 2011)
403 Excavation for Foundation 403 (March 2023) 403 (March 2022)
404 Trenching and Excavation for Catch Basins and Storm Sewers 404 (March 2022) 404 (March 2011)
405 Temporary Diversion of Streams 405 (March 2022) 405 (March 2011)
410 Select Bedding for Storm Sewers, Sub-Drains and Catch Basins 410 (March 2022) 410 (March 2012)
411 Select Backfill for Long Span Structural Plate Structures 411 (March 2024) 411 (March 2023)
420 Supply and Installation of Pipe for Storm Sewers and Perforated Pipe for Sub-Drainage 420 (March 2022) 420 (March 2011)
421 Supply and Installation of Pipe Culverts 421 (March 2024) 421 (March 2023)
422 Saddle Branch Supply and Installation 422 (March 2022) 422 (March 2011)
423 Supply and Installation of Structural Plate Pipe 423 (March 2024) 423 (March 2023)
424 Supply and Installation of Structural Plate Arch 424 (March 2024) 424 (March 2023)
425 Timber Culvert Extension 425 (March 2022) 425 (March 2011)
426 Design, Supply, and Installation of Long Span Structural Plate Structures 426 (March 2024) 426 (March 2023)
430 Screen End Treatment for Corrugated Steel Pipe 430 (March 2022) 430 (March 2011)
440 Cleanout of Existing Culverts 440 (March 2024) N/A
441 Cleanout of Existing Storm Sewers, Catch Basins, Manholes and Ditch Inlets 441 (March 2024) N/A
450 Concrete Footings for Structural Plate Structures 450 (March 2022) 450 (March 2011)
451 Concrete Headwalls for Structural Plate Structures 451 (March 2022) N/A
452 Reinforced Concrete Slotted Weir Fish Baffles 452 (March 2024) 452 (March 2022)
460 Concrete Plugs for Storm Sewers 460 (March 2022) 460 (March 2011)
461 Concrete Collars at Culvert Extension 461 (March 2022) 461 (March 2011)
470 Construction and Adjustment of Manholes, Catch Basins, and Ditch Inlets 470 (March 2022) 470 (March 2012)
475 Adjustment of Water Valve Box 475 (March 2022) 475 (March 2011)
480 Installation of Concrete Curb and Gutter 480 (March 2022) 480 (March 2012)
481 Rock Embedded Concrete Gutter Deleted 481 (March 2012)
485 Installation of Asphalt Curb 485 (March 2022) 485 (March 2011)
486 Installation of Asphalt Gutter 486 (March 2022) 486 (March 2011)