Division 5 – Miscellaneous Items

Full PDF of Division 5 (March 2023)

Section # Specification Name Current Version Previous Version
500 Index 500 (March 2023) 500 (March 2022)
501 Weighing Materials in Trucks 501 (March 2022) 501 (March 2012)
510 Cutting Asphaltic Pavement 510 (March 2022) 510 (March 2011)
511 Cutting Concrete Slab and Curb and Gutter 511 (March 2022) 511 (March 2011)
520 Storage or Disposal of Old Asphaltic Pavement 520 (March 2023) 520 (March 2022)
521 Demolition and Removal of Sidewalks, Curb and Gutter, Manholes, Catch Basins, Ditch Inlets, Fences, Guide Rails, and Guide Posts 521 (March 2022) 521 (March 2011)
522 Disposal or Salvage of Culvert or Pipe 522 (March 2023) 522 (March 2022)
523 Salvage and Reinstallation of Culvert or Pipe 523 (March 2022) 523 (March 2011)
525 Cutting Previously Installed Corrugated Steel Pipe 525 (March 2022) 525 (March 2011)
530 Supply and Installation of Traffic Light Conduit 530 (March 2022) 530 (March 2012)
535 Supply and Installation of Traffic Signal Foundations 535 (March 2022) 535 (March 2011)
537 Supply and Installation of Traffic Poles 537 (March 2022) 537 (March 2011)
540 Cast-In-Place Concrete Median Barrier 540 (March 2022) 540 (March 2012)
541 Precast Concrete Traffic Barrier 541 (March 2022) 541 (March 2012)
570 Installation of Concrete Sidewalk 570 (March 2022) 570 (March 2012)
575 Installation of Asphalt Sidewalk 575 (March 2022) 575 (March 2011)
580 Sign and Signpost Installations 580 (March 2022) 580 (March 2012)
582 Disposal or Salvage of Signs and Signposts 582 (March 2022) 582 (March 2011)
583 Salvage and Reinstallation of Signs and Signposts 583 (March 2022) 583 (March 2011)
590 Wood Preservation 590 (March 2011) N/A