Full PDF of Division 6 (March 2024)
Section # | Specification Name | Current Version | Previous Version |
600 | Index | 600 (March 2022) | 600 (March 2011) |
601 | Supply and Installation of Gabions | 601 (March 2022) | 601 (March 2011) |
610 | Rip Rap Treatment | 610 (March 2022) | 610 (March 2011) |
615 | Armour Stone | 615 (March 2024) | 615 (March 2022) |
620 | Bin-Type Retaining Wall | 620 (March 2022) | 620 (March 2011) |
625 | Design, Supply and Install Welded Wire Wall | 625 (March 2022) | 625 (March 2011) |
631 | Seeding | 631 (March 2022) | 631 (March 2011) |
632 | Hydroseeding | 632 (March 2022) | 632 (March 2012) |
633 | Sodding | 633 (March 2022) | 633 (March 2011) |
634 | Soil for Hydroseeding | 634 (March 2022) | 634 (March 2011) |
635 | Lime for Hydroseeding | 635 (March 2022) | 635 (March 2011) |
636 | Erosion Control Blanket | 636 (March 2022) | 636 (March 2011) |
640 | Supply & Installation of Guide Rail | 640 (March 2024) | 640 (March 2022) |
643 | Salvage and Salvage and Reinstallation of Guide Rail | 643 (March 2024) | 643 (March 2022) |
645 | Supply and Installation of Wooden Guide Posts | 645 (March 2022) | 645 (March 2011) |
660 | Supply and Installation of Chain Link Fence | 660 (March 2022) | 660 (March 2011) |