Proponent: Exploits Valley Renewable Energy Corporation (EVREC)
Summary of Environmental Assessment Process
Project Description:
The Proponent is proposing to construct and operate a 3.5 gigawatt (GW) onshore wind energy project consisting of three wind farms with up to 530 turbines in the Central Newfoundland area, and a 150-megawatt solar farm and a 2.6 GW hydrogen/ammonia production facility in Botwood.
- October 7, 2024 – The undertaking was registered.
- November 11, 2024 – Deadline for public comments.
- November 21, 2024 – The Minister’s decision is due.
- December 6, 2024 – The Minister’s decision is due (extended).
- December 5, 2024 – The Minister determined that an Environmental Impact Statement (EIS) is required, and an Environmental Assessment Committee is appointed.
- April 4, 2025 – EIS Guidelines due to be issued.
- February 13, 2025 – Draft EIS Guidelines for public review.
- March 26, 2025 – Deadline for public comments on Draft EIS Guidelines.
- April 2, 2025 – Approved EIS Guidelines Issued.
- May 15, 2026 – EIS Submitted.
- July 4, 2026 – Deadline for public comments on the EIS.
- July 24, 2026 – The Minister’s decision on the acceptability of the EIS is due.
- Documents:
- Registration Document (3 MB)
- Appendix A – Drawings 1.1-3.8 (20 MB)
- Appendix A – Drawings 3.9-3.22 (16 MB)
- Appendices B – F (5 MB)
- Appendix B – CO2 Summary From EVREC
- Appendix C – Atlantic Canada Conservation Data Centre (ACCDC) Report
- Appendix D – Archaeology Report
- Appendix E – Public Meetings/Information Sessions
- Appendix F – Environmental Protection Plan (EPP) Table of Contents.
- Decision Letter (EIS Required and EAC Appointed) (102 KB)
- DRAFT EIS Guidelines (667 KB)
- Decision Letter (Approved EIS Guidelines) (36 KB)
- Approved EIS Guidelines (1.2 MB)
- Registration Document (3 MB)
- Environmental Impact Statement
- EVREC Botwood EIS Summary (4.7 MB)
- EVREC Botwood EIS (9.2 MB)
- EVREC Botwood EIS Appendix A – Part 1 of 13 (Drawing 2.1-1 to Drawing 3.2-2M) (69.7 MB)
- EVREC Botwood EIS Appendix A – Part 2 of 13 (Drawing 3.2-2N to Drawing 3.2-2AZ) (63.7 MB)
- EVREC Botwood EIS Appendix A – Part 3 of 13 (Drawing 6.1-1 to Drawing 6.4-3D) (44.0 MB)
- EVREC Botwood EIS Appendix A – Part 4 of 13 (Drawing 6.5-1 to Drawing 6.5-3AH) (64.6 MB)
- EVREC Botwood EIS Appendix A – Part 5 of 13 (Drawing 6.6-1A to Drawing 6.8-1J) (50.3 MB)
- EVREC Botwood EIS Appendix A – Part 6 of 13 (Drawing 6.9-1A) (54.2 MB)
- EVREC Botwood EIS Appendix A – Part 7 of 13 (Drawing 6.9-1B to Drawing 6.9-1C) (47 MB)
- EVREC Botwood EIS Appendix A – Part 8 of 13 (Drawing 6.9-1D to Drawing 6.9-1H) (55.6 mb)
- EVREC Botwood EIS Appendix A – Part 9 of 13 (Drawing 6.9-1I to Drawing 6.9-1J) (18.8 MB)
- EVREC Botwood EIS Appendix A – Part 10 of 13 Drawing 6.9-2A to Drawing 6.11-9D) (51.1 MB)
- EVREC Botwood EIS Appendix A – Part 11 of 13 (Drawing 6.12-1A to Drawing 7.10-7) (55.5 MB)
- EVREC Botwood EIS Appendix A – Part 12 of 13 (Drawing 8.1-1 to Drawing 10.5-1F) (69.7 MB)
- EVREC Botwood EIS Appendix A – Part 13 of 13 (Drawing 11.1-1 to Drawing 18.3-1) (69.7 MB)
- EA2327 – EVREC Botwood EIS Appendix B1 to Appendix F3 (55.4 MB)
- Appendix B Existing Environment
- B.1 Receptors List
- Appendix C Engagement
- C.1 Engagement – Logs, Materials, Open House Slides, Support Letters
- Appendix D Air
- D.1 Air Dispersion Study Report
- Appendix E GHG Reports
- E.1 GHG Calculation Tables – Wind
- E.2 GHG Calculation Tables – Ind
- E.3 GHG Calculation Tables- Solar
- E.4 Emissions Inventory Report
- Appendix F Noise Reports
- F.1 Operational Noise Assessment
- F.2 Construction Noise Study Report
- F.3 Operational Noise Study Report
- Appendix B Existing Environment
- EVREC Botwood EIS Appendix G1 to Appendix H1 (27.3 MB)
- Appendix G Shadow Flicker
- G.1 Shadow Flicker Assessment
- Appendix H Aquatic
- H.1 Surface Water Quality Results
- Appendix G Shadow Flicker
- EVREC Botwood EIS Appendix H2 (64.7 MB)
- Appendix H Aquatic
- H.2 Baseline Aquatic Environment Report
- Appendix H Aquatic
- EVREC Botwood EIS Appendix H3 to Appendix H4 (58.7 MB)
-
- H.3 Hydrology Assessment
- H.4 Technical Memorandum – EVREC Discharge Creek Response to Plant Discharge
-
- EVREC Botwood EIS Appendix I1 (39.2 MB)
- Appendix I Vegetation and Wetlands
- I.1 Baseline Vegetation and Wetlands Report
- Appendix I Vegetation and Wetlands
- EVREC Botwood EIS Appendix J1 to Appendix M1 (42.6 MB)
- Appendix J Terrestrial Fauna
- J.1 Terrestrial Fauna Baseline Report
- Appendix K Bat
- K.1 Baseline Bats Report
- K.2 EVREC Operational Curtailment Bat Mitigation Strategy Paper
- Appendix L Caribou
- L.1 Caribou Technical Memo
- Appendix M Avifauna
- M.1 Baseline Avian Report
- Appendix J Terrestrial Fauna
- EVREC Botwood EIS Appendix M2 to Appendix Q14 (27.9 MB)
- Appendix M Avifauna
- M.2 Baseline Radar/Acoustics Reports
- Appendix N Heritage Resources
- N.1 EVREC Green Energy Hub Historic Resources Mitigation Plan
- Appendix O Economic and Business
- O.1 Economic Impact Assessment
- Appendix P Infrastructure and Community Services
- P.1 Traffic Impact Study
- Appendix Q Management Plans
- Q.1 Avian Management Plan
- Q.2 Emergency Response Plan
- Q.3 Project Public Participation Plan
- Q.4 Domestic and Commercial Woodcutting Consultation Plan
- Q.5 Mineral Resource Industry Consultation Plan
- Q.6 Quarry Resource Consultation Plan
- Q.7 Asset Retirement Obligation\
- Q.8 Outfitter Environmental Effects Monitoring Plan
- Q.9 Erosion and Sediment Control Plan – Table of Contents
- Q.10 Groundwater and Surface Water Monitoring Management Plan – Table of Contents
- Q.11 Hazardous Materials Response and Training Plan
- Q.12 Waste Management Plan
- Q.13 Water Management Plan (Construction and Post Construction Phase)
- Q.14 Workforce and Employment Plan
- Appendix M Avifauna
- Public Notices:
- Project Registered (85 KB)
- EIS Required and EAC Appointed (105 KB)
- DRAFT EIS Guidelines for Public Review (90 KB)
- Approved EIS Guidelines Issued (91 KB)
- EIS Submitted for Review (96 MB)
Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free