Check vehicle on level ground if possible, set parking brake, block wheels, ensure that all tanks are drained. Suggested maximum time required for this pre-trip inspection is 15 minutes.
CIRCLE CHECK
- Check security and condition of compressor and belts under hood.
- Check condition and security of hoses and flex lines.
- Pull all slack adjusters manually (use pry bar if necessary). Check for travel, mechanical condition, wear.
NOTE: A brake adjustment (S cam type only) will be required as part of the air test examination.
BUILD UP AIR PRESSURE, WATCHING THAT THE:
- Warning device(s) cuts out at approximately 60 P.S.I.
- Pressure builds from 50-90 P.S.I. within five minutes.
- Governor cuts out between 105 P.S.I. minimum and 125 P.S.I. maximum.
AT MAXIMUM PRESSURE:
- Release parking brakes (if equipped) to prevent compounding.
- Shut off motor.
- Make a full brake application. Check for:
- air loss less than 4 P.S.I. drop within one minute;
- audible air leaks.
START MOTOR AND FAN BRAKES
- Stop fanning at 80 P.S.I. to see if governor has cut in (needle should start to climb).
- Continue fanning:
- warning device should start operating at approximately 60 P.S.I.;
- parking brake should apply at 45-20 P.S.I. if plumbed into main reservoir tanks.
REBUILD PRESSURE TO MAXIMUM
- With parking brakes set, remove wheel chocks.
- Gently tug test against parking brakes in low gear.
- Release parking brakes and move vehicle ahead slowly and make a service brake application to check the brake response.