Pressure System Inspections

Any installation of or alterations to a pressure system, in accordance with the Boiler, Pressure Vessel and Compressed Gas Regulations, must have a permit and must be inspected when the work is completed. In addition, all boilers and pressure vessels are inspected periodically in accordance with the Periodic Inspection Internal Policy.

Requirements

When the work covered by the permit is completed, the permit holder is required to contact the Government Service Centre to arrange for an inspection of the pressure system. An advance notice of 96 hours is required.

Legislation

Statutes Regulations
Public Safety Act Boiler, Pressure Vessel and Compressed Gas Regulations

Fees

  • Per the Regulations
  • Fees Policy (68 KB)
    1. $108.00/hr (3 hours minimum) plus travel and subsistence
    2. The fee for a Permit to Install or Alter a Pressure System is $48.00 (H.S.T. not applicable).
Printed copies of applications and publications are available at the Government Service Centre Division’s regional and area offices.

 

Contact

Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free