Proponent: North Atlantic Refining Limited
Summary of Environmental Assessment Process
Project Description:
The proponent proposes to develop a 200,000 barrel butane storage facility at its refinery at Come By Chance. The facility will comprise one 200,000 barrel storage tank, as well as auxiliary facilities such as a butane dryer and refrigeration systems with associated piping including gas detection and fire water system, and other associated infrastructure such as an access road, fence and dike. The purpose of the proposed project is to store part of the butane produced during the summer gasoline season, which would then be available for winter gasoline blending. The project is scheduled to begin in the summer of 2002.
- May 27, 2002 – The undertaking was registered.
- July 1, 2002 – Public comments were due.
- July 26, 2002 – The Minister releases the project from the environmental assessment process.
- Documents:
- Registration
- Text (849 KB)
- Location (117 KB)
- Plot Plan (107 KB)
- Drawing (50 KB)
- Process Flow Diagram (75 KB)
- Registration
- Public Notices:
- Project Registered (4 KB)
- Project Released (7 KB)