Proponent: Town of Botwood and Peterview
Summary of Environmental Assessment Process
Project Description:
The proponents, the towns of Botwood and Peterview intend to construct a new water transmission main from the existing Exploits Regional Water Supply Line on New Bay Road (near Wooddale Farms) to Botwood and Peterview. The transmission main will be approximately 17 kilometres in length and run generally in an east west direction. The main will be buried 1.8 metres under the existing ground and be constructed of either ductile iron or polyvinyl chloride pipe. The transmission main will be equipped with drain lines, main valves and air valves and will include one pressure reducing chamber.
- March 26, 2003 – The undertaking was registered.
- May 2, 2003 – Public comments are due.
- May 14, 2003 – The Minister released the project from further environmental assessment.
- Documents:
- Registration (21 KB)
- Map (969 KB)
- Guidelines (50 KB)
- Public Notices:
- Project Registered (7 KB)
- Project Released (7 KB)
- EPR Guidelines Issued (31 KB)
Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free