Registration Number: 1164

John Newhook’s Pond Water Supply and Access Road

Proponent: Town of Norman’s Cove-Long Cove

Summary of Environmental Assessment Process

Project Description:

The proponent proposes to install a new water supply for the Town of Norman’s Cove-Long Cove and construct a 2.6 kilometre access road to the proposed chlorination building, dam and intake pipe location. The access road will start approximately 250 metres west of the last residence in Long Cove, running to John Newhooks Pond and be a 4 metre wide class ‘A’ topped gravel road within a 15 metre right-of-way. The water supply transmission pipeline will follow the routing of the access road. Operation of the proposed water supply system will involve daily inspection of the chlorination building and intermittent inspection of the intake/screen house and dam.

  • November 3, 2004 – The undertaking was registered.
  • December 10, 2004 – Public comments are due.
  • December 23, 2004 – The Minister releases the project from further environmental assessment.

Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free