Registration Number: 1393

Branch Area Cranberry Farm

Proponent: Mr. Reginald Careen

Summary of Environmental Assessment Process

Project Description:

The proposed undertaking will be located 7 kilometres east of St. Bride’s, along route 100. The 50 acre site will have 38 acres of cranberry beds and an 80 metre access road. There will be brush cutting, ditching, placement of sand beds, and installation of water control structures and drainage tiles, during the construction phase. The site will be developed over a five year period with construction tentatively scheduled to begin this fall.

  • August 12, 2008 – The undertaking was registered.
  • September 17, 2008 – Public comments are due.
  • September 26, 2008 – The Minister’s decision is due.