Proponent: Beothic Fish Processors Ltd.
Summary of Environmental Assessment Process
Project Description:
The proponent proposes to operate a 40 hectare cranberry farm, developed over a five year period. The site is located off Route 320 between Newtown and Lumsden. A new 1.7 kilometre access road will be constructed off route 320. Site work will include ditching, removal of a layer of peat, leveling of beds, discharge/sediment pond, water control structures, sand beds and installation of drainage tile in beds. Construction is tentatively scheduled to begin in May 2009.
- January 20, 2008 – The undertaking was registered.
- February 25, 2009 – Public comments are due.
- March 06, 2009 – The Minister’s decision is due.
- April 14, 2009 – The Minister rejected the undertaking.
- Documents:
- Registration (38 KB)
- Map 1 (2.8 MB)
- Map 2 (550 KB)
- Public Notices:
- Project Registered (10 KB)
- Project Released (24 KB)
Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free