Registration Number: 1517

First Pond Bottom Brook Gravel Quarry

Proponent: Johnson’s Construction Ltd.

Summary of Environmental Assessment Process

Project Description:

The proponent proposes to develop a 4 hectare aggregate quarry, locatedapproximately 1 kilometre east of Southwest Brook on the east side of the Trans Canada Highway, 1.5 kilometres north of the Burgeo Road intersection. Access to the site is viaan existing road. No construction is required prior to commencement of operations. A screening operation will be established to process sand to be used in the manufacture of ready-mix concrete at an alternate location. The screening operation will be equipped with a water-based dust suppression system. The operation will be conducted seasonally.

  • June 28, 2010 – The undertaking was registered.
  • August 11, 2010 – Public comments are due.
  • August 12, 2010 – The Minister’s decision is due.
  • August 24, 2010 – The undertaking was released.

Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free