Proponent: Bryan Borland
Summary of Environmental Assessment Process
Project Description:
The proponent proposes to develop a quarry located three kilometers southwest of PetersPond, off Route 350 (the Botwood Highway) in the Bishop’s Falls area. The project willproduce sand, gravel and borrow material for local demand. The site covers an area 5hectares in size. Operations are scheduled to begin in May, 2012.
- April 12, 2012 – The undertaking was registered.
- May 24, 2012 – Public comments are due.
- May 27, 2012 – The Minister’s decision is due.
- November 8, 2013 – The project was withdrawn.
- Documents:
- Registration (924 KB)
- Public Notices:
- Project Registered (45 KB)
- Project Withdrawn (37 KB)
Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free