Proponent: C&T Enterprises Ltd.
Summary of Environmental Assessment Process
Project Description:
The proponent proposes to develop a four hectare site to serve as a marine terminal on Buckles Point in the Town of Forteau, Labrador. The proposed site is to include a 2.8 hectare lay down area and a 1.2 hectare wharf structure. The wharf will be designed with a rock approach extending from the shoreline some 130 metres to a rock-filled structure. The footprint of the approach and the wharf will be approximately 1.14 hectares. Construction of the wharf structure is anticipated to take seven months to complete.
- March 20, 2013 – The undertaking was registered.
- April 25, 2013 – Deadline for public comments.
- May 4, 2013 – The minister’s decision is due.
- May 24, 2013 – The project was released.
- Documents:
- Registration (460 KB)
- Public Notices:
- Project Registered (39 KB)
- Project Released (42 KB)
Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free