Registration Number: 1726

Fortune ATV Trail

Proponent: Fortune ATV Trail Association

Summary of Environmental Assessment Process

Project Description:

The Fortune ATV Trail Association proposes to develop a 5.5 kilometre multi-purpose ATV trail between Fortune Brook and Jenkins Hill. The trail will connect to the existing Fortune North West Pond trail system as well as the Lamaline trail system to the south and the existing Grand Bank – Lance au Loup Trail to the east. Construction of the trail will require the use of a small track excavator and manual labour to remove brush and debris.Construction is proposed to be completed in two phases in the fall 2013 and in the fall 2014.

  • September 17, 2013 – The undertaking was registered.
  • October 23, 2013 – Deadline for public comments.
  • November 1, 2013 – The minister’s decision is due.
  • March 6, 2014 – The Minister announced that the project is released.

Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free