Proponent: Envirosoil Limited
Summary of Environmental Assessment Process
Project Description:
The proponent proposes to develop a drill mud processing facility at 24-42 Hops Street, off Highway 2 (Peacekeeper’s Way) and Fowler’s Road within the Town of Conception Bay South. This facility will require the installation and operation of a Vacuum Assisted Recovery Unit to treat waste drilling mud, fluids and cuttings to recover the synthetic drilling fluid. The proposal also includes construction of an operational pad for containment, a pelletizing plant, fully contained pellet storage, and a bulk fuel storage tank.
- January 3, 2020 – The undertaking was registered.
- February 11, 2020 – Deadline for public comments.
- February 17, 2020 – The Minister’s decision is due.
- March 2, 2020 – The Minister’s decision is due (extended).
- April 21, 2020 – Environmental Preview Report (EPR) is required.
- May 6, 2020 – Environmental Assessment Committee appointed.
- June 13, 2020 – Environmental Preview Report Guidelines due to be issued.
- July 30, 2020 – Environmental Preview Report Guidelines issued.
- Documents:
- Registration (5.9 MB)
- Decision Letter (47 KB)
- EPR Guidelines (117 KB)
- Public Notices:
- Project Registered (77 KB)
- EPR Required (41 KB)
- Committee Appointed (80 KB)
- EPR Guidelines Issued (15 KB)