Proponent: The Town of Hampden
Summary of Environmental Assessment Process
Project Description:
The proponent is proposing to develop a municipal by-road for residential property access and fronting in the Town of Hampden. The proposed by-road will be approximately 200 metres in length and constructed using standard construction methods including clearing, grubbing, grading and the placement of rock/granular sub-base with granular Class A topping. In the future asphalt topping may be placed depending on feasibility.
- May 5, 2022 – The undertaking was registered.
- June 10, 2022 – Deadline for public comments.
- June 19, 2022 – The Minister’s decision is due.
- June 17, 2022 – The Minister determined that the project is released.
- Documents:
- Registration Document (8.35 MB)
- Decision Letter (233 KB)
- Public Notices:
- Project Registered (108 KB)
- Project Released (142KB)
Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free