PROPONENT: Turf Point Resources Ltd.
Summary of Environmental Assessment Process
Project Description:
The proponent proposes to develop and operate a six-hectare gravel and aggregate quarry approximately four kilometres southeast of the community of Flat Bay. The quarry would be located within an area previously operated as a gypsum mine site and would produce gravel and backfill materials for the construction industry. Backfill materials would also be used to maintain the proponent’s private haul road which extends to their ship loading facility in St George’s. Site development would include vegetation clearing, grubbing and stripping, and operations would include crushing, screening and stockpiling. The quarry is proposed to operate seasonally, between April and November.
- November 16, 2022 – The undertaking was registered.
- December 23, 2022 – Deadline for public comments.
- December 31, 2022 – The Minister’s decision is due.
- January 13, 2023 – The Minister’s decision is due (extended).
- January 11, 2023 – The Minister determined the project is released.
- March 17, 2023 – Conditions of Release Met.
- Documents:
- Registration (2 MB)
- Decision Letter (3 MB)
- Water Resources Managment Plan (1.7 MB)
- Plan Acceptable (778 KB)
- Public Notices:
- Project Registered (157 KB)
- Condition of Release Met(158 KB)
- Project Released (108 KB)
Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free