Registration Number: 934

Special Waste Transfer Station, Donovans Industrial Pk, Mt. Pearl

Proponent: ASCo Canada Ltd.

Summary of Environmental Assessment Process

The proponent intends to build a third industrial building of 3,000 square feet within their existing 6.9 Ha of developed property at 10 Corisande Drive in Mount Pearl in order to service the offshore oil industry. The building will have a sealed concrete bermed floor, membrane liner, and a drainage/collection system separate from the sewage system. The facility will accept some classifications of drummed (non-bulk) wastes not suitable for landfilling, and will ship them to licensed recycling or disposal facilities. There will not be any outdoor storage of drums. Construction, that could start as early as June 20, will take approximately 2 months.

  • May 3, 2001 – The undertaking was registered.
  • June 29, 2001 – The Minister announced that the project was released from environmental assessment.

Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free