Proponent: Fugro GeoSurveys
Summary of Environmental Assessment Process
Project Description:
The proponent is proposing to construct and operate a temporary research facility adjacent to Eddies Cove on the Northern Peninsula approximately 62 kilometres southwest of St. Anthony. The project, covering an area of approximately 1.9 hectares, will require the construction of a temporary, lined containment basin and will include a helicopter landing area and temporary trailers. Operation will include filling of the basin with seawater, development of a variety of ice conditions, injection of crude oil, and testing of the EFNMR system. Upon completion, the seawater will be treated and drained, and the containment basin decommissioned. Construction is scheduled for December 2015 and is anticipated to take three weeks. Flooding of the basin is expected to occur in January and full operations in March 2016.
- October 29, 2015 – The undertaking was registered.
- December 10, 2015 – Deadline for public comments.
- December 12, 2015 – The Minister’s Decision is due.
- January 21, 2016 – An Environmental Preview Report is required.
- March 18, 2016 – Environmental Assessment Committee appointed.
- March 24, 2016 – Environmental Preview Report Guidelines issued.
- February 26, 2021 – The Minister’s decision is expired.
- Documents:
- Registration (4.6 MB)
- Decision Letter EPR required (21 KB)
- EPR Guidelines (207 KB)
- Public Notices:
- Project Registered (29 KB)
- EPR Required (34 KB)
- Committee Appointed (60 KB)
- EPR Guidelines Issued (24 KB)
Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free