Proponent: Proponent: Newfoundland and Labrador Hydro
Summary of Environmental Assessment Process
Project Description:
The proponent proposes to construct an earthen perimeter berm to prevent flooding at the Newfoundland and Labrador Hydro Springdale Terminal Station on Route 392. The flood control berm surrounding the station will be approximately 270 metres in length with a height of one metre. The berm is to control flooding and runoff from Davis Brook, a tributary of Indian River.
- August 6, 2019 – The undertaking was registered.
- September 11, 2019 – Deadline for public comments.
- September 20, 2019 – The Minister’s decision is due
- October 10, 2019 – The undertaking was released.
- Documents:
- Registration (8 MB)
- Minister’s Decision Letter (65 MB)
- Public Notices:
- Project Registered (45 KB)
- Project Released (486 KB)
Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free