Proponent: Cahill Group of Companies
Summary of Environmental Assessment Process
Project Description:
The proponent is proposing to install hydraulic rip-rap shoreline stabilization along 140 metres of shoreline adjacent to a residential property on Laurel Road in Conception Bay South, east of the Manuel’s River discharge. The purpose of the shoreline stabilization is to reduce shoreline erosion in the area of the residential property to ensure the foundation and structural integrity of the building is not compromised.
- July 22, 2020 – The undertaking was registered.
- August 28, 2020 – Deadline for public comments.
- September 5, 2020 – The Minister’s decision is due.
- Documents:
- Registration (4.7 MB)
- Decision Letter (136 KB)
- Public Notices:
- Project Registered (391 KB)
- Project Released (28 KB)
Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free