Registration Number: 1962

Glenburnie Drydock

Proponent: 3 T’s Limited

Summary of Environmental Assessment Process

Project Description:

The proponent proposes to construct a 2,090 square metre dry dock at Glenburnie in Bonne Bay, Western Newfoundland. The dry dock will extend 76.2 metres out from the high water mark and will be 27.4 metres wide. The structure will consist of a 15.2 metre wide concrete slipway bordered by two piers each with a 0.3 metre wide inner wall and a 5.8 metre band of armour stone.

  • May 24, 2018 – The undertaking was registered.
  • July 2, 2018 – Deadline for public comments.
  • July 8, 2018 – The Minister’s Decision is due.
  • July 26, 2018 – Environmental Preview Report (EPR) required.
  • September 23, 2018 – EPR Guidelines due to be issued.
  • October 25, 2018 – Environmental Assessment (EA) Committee appointed.
  • December 20, 2018 – EPR Guidelines issued.

Adobe® Acrobat® Reader software can be used for viewing PDF documents. Download Acrobat® Reader for free